Healthcare Construction
Built for practices that
can't afford to open late.
We build dental practices, medical clinics and pharmacies across Ontario, Alberta and British Columbia — coordinated around inspections, equipment deliveries and the day you've told your patients you'll be open.
Recognition
Building Growth.
Shaping Excellence.
Recognized Among Canada’s Top Growing Companies
City Contractors has proudly earned recognition as one of Canada’s Top Growing Companies, reflecting our continued commitment to innovation, quality, and long-term business excellence. This achievement highlights the dedication of our team, the trust of our clients, and the strong foundation that continues to drive our growth across every project we undertake.
How we build
Five stages,
no surprises.
Most healthcare builds go wrong in the gaps — between the drawings and the permit, between the equipment order and the rough-in. These are the five points where we close those gaps.
Book a site walkthrough-
01
Site review & feasibility
We walk the unit before anything is drawn. Ceiling heights, existing services, landlord restrictions and the base building's limits decide what is actually buildable — and what would cost you three months.
Typically 1–2 weeks
-
02
Drawings & permit
We coordinate the architect, the equipment supplier and the engineers so one set of drawings satisfies the building department, the health unit and your landlord's approval process at the same time.
Permit timelines vary by municipality
-
03
Fixed price & schedule
You get one number and one date, with the assumptions written down. Long-lead items — cabinetry, imaging equipment, mechanical units — are ordered against that schedule, not after it.
Locked before demolition starts
-
04
Build
One site supervisor, one point of contact, and a weekly update you can forward to your partners. Inspections are booked ahead of the work being ready, not after it.
Weekly progress reporting
-
05
Handover & opening
Final inspections, equipment commissioning, deficiency list closed out, and warranties and manuals handed over in one package — so the day you open is the day you planned to open.
Deficiency list closed before handover
What we build
Four kinds of healthcare space,
one way of working.
Every healthcare build answers to a health unit, an inspector or a franchisor. We plan around those sign-offs so none of them delays your opening.
-
Dental Practices
Operatories, sterilisation corridors and imaging rooms built to the layout your equipment rep signed off on — not a compromise discovered on install day.
- Lead-lined imaging rooms
- Sterilisation & infection control
- Chair-side plumbing & vacuum
- Cabinetry coordinated to equipment
-
Medical Clinics
Exam rooms, reception and accessible washrooms laid out for patient flow and staff sightlines, and detailed to pass an accessibility review the first time.
- Exam & treatment rooms
- AODA-compliant washrooms
- Reception & records security
- Acoustic separation for privacy
-
Pharmacies
Dispensaries, secure storage and consultation rooms built to the standards your college inspection will hold you to, with the retail floor still working as retail.
- Dispensary & compounding
- Narcotics-grade secure storage
- Private consultation rooms
- Retail shelving & POS fit-out
-
Veterinary clinic constructionVeterinary Clinics
Treatment and surgical suites, kennels and isolation rooms — built around the drainage, wash-down finishes and noise separation animal care needs.
- Surgical & treatment suites
- Kennel and isolation rooms
- Wash-down walls & floor drainage
- Acoustic separation from reception
Building something else in healthcare — a lab, a veterinary clinic, a physio studio? Tell us about it
Brands & clients
Brands and clients we’ve worked with
Start your build
Tell us the date you
want to open.
Send us the space, the trade and the opening date you have in mind. We'll walk the unit, tell you honestly whether that date is achievable, and put a number against it.